There are a lot of small and large details necessary before we close the building in - and hopefully turn on the heat.
With the plumbing in the garage ceiling largely finished we were able to put in the insulation.
The large steel hearth box is finished so we were able to get it in through the large fixed window aperture. Then that window and the sliding door were installed - that leaves just the doors to the garage to go.
The garage:








Comments
Post a Comment